ForgotPassword?
Sign Up
Search this Topic:
Forum Jump
Posts: 8106
Jul 29 08 8:23 AM
Administrator
The control has been designed to test the Sensor Memory and Motor. During the Field Service Test, if a fault has been detected, the test will abort any time after the motor current has been checked and 2 or more LED's will begin to Flash. A Memory / Software check will occur immediately after the test is started. The LED and one of the following: Reading material... Link one Link two Link three
She says the upper rack is full of crumbs (worst than before it been washed) and she said he has checked the hose, pump and arms, and still no changes..
Share This